Legal service
Housing Disrepair Solicitors
Leaks, persistent mould or failed heating can make daily life difficult and may raise legal duties beyond routine maintenance. Highfin's published Housing service includes property disrepair and maintenance disputes. A useful assessment starts with the condition, its cause, the landlord's responsibilities and the evidence of reporting and response.

Housing Disrepair
Understanding housing conditions and repair duties
Discuss your Housing Disrepair enquirySources checked on . This general information does not assess your individual circumstances.
Repair and fitness are related but different
For relevant short residential leases in England, section 11 of the Landlord and Tenant Act 1985 covers the structure and exterior and installations supplying water, gas, electricity, sanitation, space heating and hot water. It does not make the landlord responsible for every appliance or every item in the home.
Section 9A, introduced by the Homes (Fitness for Human Habitation) Act 2018, separately requires relevant rented homes in England to be fit at the start and remain fit during the letting. A serious condition can engage fitness duties even where the argument is not simply that something has fallen into disrepair.
Coverage and exceptions depend on the tenancy and cause. Tenant-caused damage, items the tenant can remove and some consent or reinstatement issues require separate analysis. A long lease or licence should not be assumed to carry identical obligations.
Identify the defect and its effect on the home
Concerns may include structural defects, leaking roofs or pipes, damp and mould, unsafe installations, failed heating or defective sanitation. The seriousness, duration and effect on occupants matter. An inspection may be needed to establish the cause and appropriate work.
Record recurring problems rather than only the latest visible damage. Tell the landlord about health or accessibility factors relevant to urgency. Photographs help show conditions, but do not by themselves establish legal responsibility or medical causation.
- Dated photographs, repair reports and inspection findings.
- A chronology of notifications, visits, attempted work and recurrence.
- Evidence of affected rooms, damaged belongings and reasonable expenses.
Report the problem and preserve the response
Notify the landlord or authorised agent promptly, preferably in a form you can keep. Describe the location, symptoms, impact and any immediate danger. Preserve earlier reports: awareness of a defect and the time allowed to act can be central to a claim.
Arrange reasonable inspection and repair access and keep records of appointments or difficulties. For section 11 inspections, the statutory term ordinarily requires reasonable daytime access with at least 24 hours' written notice. This is not a general licence for unannounced entry.
Do not wait for routine legal correspondence if a hazard needs immediate attention. Use the appropriate emergency or landlord reporting route. Highfin's website form is not an emergency reporting service.
Awaab's Law: distinguish current duties from later phases
In England, Awaab's Law applies to qualifying social housing leases. The first phase began on 27 October 2025 and covers significant damp and mould hazards and qualifying emergency hazards. The regulations define the risk, responsibility and exceptions; a general maintenance complaint does not automatically trigger every prescribed deadline.
The emergency provisions require investigation and relevant safety action as soon as reasonably practicable within the applicable 24-hour period, subject to the regulations, including temporary rehousing provisions. Significant-hazard investigations ordinarily have a 10-working-day period; physical-inspection requests and subsequent work have their own rules.
Official guidance schedules a wider significant-hazard phase for 30 November 2026. That is still future as of 12 October 2026. Extension to private rented tenancies is under consultation, not an operative universal private-sector deadline. Existing repair and fitness obligations continue to matter.
Different duties for Welsh occupation contracts
Wales has its own Renting Homes repair and fitness framework. Relevant occupation contracts include duties concerning the structure, exterior and service installations. The Welsh fitness rules must be assessed separately from English section 9A and Awaab's Law.
For the continuing repair and fitness duties addressed by section 97, awareness and a reasonable time to undertake necessary work are important. Keep the written contract and reporting records. Welsh contracts may also contain a term about rent during unfitness, but disputed unfitness can create arrears and possession risks: obtain advice before withholding payment.
Pre-action steps and possible remedies
For an English housing-conditions claim, the pre-action protocol provides a structure for a letter of claim, relevant records, expert proposals and consideration of resolution. The landlord normally has 20 working days to respond to the letter. That procedural period is not permission to leave an urgent hazard untreated.
An appropriately instructed expert may address cause, responsibility and necessary works. Urgent relief or limitation issues may require a different timetable. Possible outcomes include agreed work, a court order for remedial action or damages where a breach and loss are established; no award or recovery amount is guaranteed.
Ask Highfin to assess the documents and confirm whether it can act, what work is proposed and the costs. A complaints process or negotiation should not be assumed to suspend a legal deadline.
Official guidance
- Landlord and Tenant Act: repairing obligations
- Landlord and Tenant Act: fitness in England
- GOV.UK: homes fit for human habitation
- Housing Conditions Claims Protocol — England
- Awaab's Law: current regulations
- GOV.UK: Awaab's Law implementation phases
- GOV.UK: consultation on private-sector Awaab's Law
- Renting Homes: repair obligations
- Renting Homes: awareness and repair time
- Welsh Government: fitness for human habitation
- Prepare the repair history
- Bring the agreement, first report, follow-up correspondence and any inspection or expert material. Explain urgent risks at the outset.
- Confirm funding and scope
- Charges, expert costs and any funding arrangement need individual confirmation. No no-win-no-fee offer, legal-aid availability or compensation guarantee is stated.
Frequently asked questions
Your questions
Is every damp or mould problem legally disrepair?
Not necessarily. The cause and condition may engage repair duties, fitness duties or qualifying Awaab's Law obligations. Evidence and the applicable tenancy framework determine the analysis.
Does Awaab's Law give every private tenant a 24-hour repair right?
No. The current prescribed regime concerns qualifying social homes in England. Its emergency requirements are conditional, and the private-sector extension remains a proposal as of the verification date.
Must I obtain my own expert report immediately?
An expert may be needed, but the pre-action process includes proposals for expert instruction. Seek advice before incurring costs or commissioning a report that may not meet the claim's requirements.
Can I stop paying rent until repairs are done?
Do not assume that a complaint cancels rent. Welsh unfitness terms require separate assessment, and disputed facts can expose an occupier to arrears proceedings. Get advice on the actual agreement and evidence.
Will a claim always produce compensation?
No. Liability, the remedy sought and any proven loss require assessment. Repair work may be the priority; neither success nor a compensation figure can be promised.
Your next step · Housing Disrepair
Let’s start with
a conversation.
Enquire about Housing Disrepair using the Contact page enquiry section.
Use the enquiry form or our telephone or email contact details.
View enquiry formReturn to Housing